• Skip to primary navigation
  • Skip to main content
Motor and Generator Institute

Motor and Generator Institute

Emergency and Standby Power Education

  • My Training
  • Support
  • Log In
  • Main Site

Maintenance

Maintenance

Time limit: 0

Quiz Summary

0 of 55 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 55 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Maintenance 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19
  20. 20
  21. 21
  22. 22
  23. 23
  24. 24
  25. 25
  26. 26
  27. 27
  28. 28
  29. 29
  30. 30
  31. 31
  32. 32
  33. 33
  34. 34
  35. 35
  36. 36
  37. 37
  38. 38
  39. 39
  40. 40
  41. 41
  42. 42
  43. 43
  44. 44
  45. 45
  46. 46
  47. 47
  48. 48
  49. 49
  50. 50
  51. 51
  52. 52
  53. 53
  54. 54
  55. 55
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 55
    1. Question

    It is recommended the battery charger’s ammeter be checked ________. 

    Correct
    Incorrect
  2. Question 2 of 55
    2. Question

    Before checking the electrolyte levels and the specific gravity of the electrolyte in a starting battery, the battery charger must be turned off and locked out at least __ minutes. 

    Correct
    Incorrect
  3. Question 3 of 55
    3. Question

    Battery charger output wiring shall be _________ connected to the primary side of the starter solenoid (positive) and the EPS frame (negative), or other grounding location.

    Correct
    Incorrect
  4. Question 4 of 55
    4. Question

    Battery charger output wiring shall be permanently connected to the primary side of the starter solenoid (positive) and the EPS frame (negative), or other grounding location.

    Correct
    Incorrect
  5. Question 5 of 55
    5. Question

    Battery charger output may be temporarily connected to the primary side of the starter solenoid (positive) and the EPS frame (negative), or other grounding location.

    Correct
    Incorrect
  6. Question 6 of 55
    6. Question

    It is recommended lead acid starting batteries be replaced every _____ months.

    Correct
    Incorrect
  7. Question 7 of 55
    7. Question

    Use the Lockout/Tagout procedures found in OSHA ______ to remove the generator from automatic operation at the control panel of the EPS.

    Correct
    Incorrect
  8. Question 8 of 55
    8. Question

    The EPS shall be heated as necessary to maintain the water jacket and battery temperature determined by the EPS manufacturer for cold start and load acceptance for the type of EPSS

    Correct
    Incorrect
  9. Question 9 of 55
    9. Question

    The EPS shall be cooled as necessary to maintain the water jacket and battery temperature determined by the EPS manufacturer for cold start and load acceptance for the type of EPSS

    Correct
    Incorrect
  10. Question 10 of 55
    10. Question

    Circuit breakers rated in excess of 600 volts for Level 1 system usage shall be exercised every ___ months

    Correct
    Incorrect
  11. Question 11 of 55
    11. Question

    Circuit breakers in excess of 600 volts shall be tested under simulated overload conditions every _____.

    Correct
    Incorrect
  12. Question 12 of 55
    12. Question

    The purpose of the _____ is to provide automatic disconnection of the generator from all circuits down-line from the generator in the event that power from the generator exceeds a specified value.

    Correct
    Incorrect
  13. Question 13 of 55
    13. Question

    NFPA 110 requires the main line circuit breaker to be exercised ____.

    Correct
    Incorrect
  14. Question 14 of 55
    14. Question

    NFPA 110 requires feeder breakers to be exercised _____.

    Correct
    Incorrect
  15. Question 15 of 55
    15. Question

    EPSS circuit breakers for Level 1 system usage, including main and feed breakers between the EPS and the transfer switch load terminals, shall be exercised _____ with the EPS in the off position.

    Correct
    Incorrect
  16. Question 16 of 55
    16. Question

    When checking the coolant system always wait ___ after the engine shuts down before removing the radiator cap.

    Correct
    Incorrect
  17. Question 17 of 55
    17. Question

    Which of the following PPE is recommended at a minimum for checking coolant level.

    Correct
    Incorrect
  18. Question 18 of 55
    18. Question

    The purpose of _____ is to alert personnel to EPSS abnormalities that would prevent the EPSS from operating as designed, and to indicate when normal and alternate (emergency) power is available.

    Correct
    Incorrect
  19. Question 19 of 55
    19. Question

    Battery blanket heaters and water/oil heaters should _____ operating after the prime mover starts.

    Correct
    Incorrect
  20. Question 20 of 55
    20. Question

    Testing all indicator lamps with the Press to Test button on the control panel and on the remote annunciator panel are required only on a monthly basis.

    Correct
    Incorrect
  21. Question 21 of 55
    21. Question

    Automatic Transfer Switches sense the loss of electrical power and start the prime mover generally within __ to __ seconds.

    Correct
    Incorrect
  22. Question 22 of 55
    22. Question

    The purpose of the _____ is to convert the mechanical energy produced by the prime mover to electrical energy.

    Correct
    Incorrect
  23. Question 23 of 55
    23. Question

    The ______ drives the alternator, transforming mechanical energy into electricity.

    Correct
    Incorrect
  24. Question 24 of 55
    24. Question

    The term “Wet Stacking” indicates the presence of unburned _____ and/or _____ in the exhaust system.

    Correct
    Incorrect
  25. Question 25 of 55
    25. Question

    NFPA 110 requires exhaust temperatures be checked against manufacturer’s minimums if the generator is run or tested below __% of its nameplate rating

    Correct
    Incorrect
  26. Question 26 of 55
    26. Question

    If the engine does show evidence of wet stacking, an engine load run test is mandatory for _ hours

    Correct
    Incorrect
  27. Question 27 of 55
    27. Question

    To check the exhaust system during weekly inspections, the engine must be _____.

    Correct
    Incorrect
  28. Question 28 of 55
    28. Question

    A condensate trap and drain valve shall be provided at the low points of exhaust piping, unless the piping is self-draining.

    Correct
    Incorrect
  29. Question 29 of 55
    29. Question

    Checking the fuel system during weekly inspections includes everything except which of the following.

    Correct
    Incorrect
  30. Question 30 of 55
    30. Question

    Fuel solenoid valves shall have a __________ operation, or a _____ bypass valve.

    Correct
    Incorrect
  31. Question 31 of 55
    31. Question

    A fuel bypass valve may be used to shut the EPS down in case of failure or emergency.

    Correct
    Incorrect
  32. Question 32 of 55
    32. Question

    The fuel manual bypass valve shall be visible and accessible and it’s purpose identified.

    Correct
    Incorrect
  33. Question 33 of 55
    33. Question

    Spark-ignited generator sets shall be exercised at least _____ with the available EPSS load for __ minutes or until the water temperature and the oil pressure have stabilized.

    Correct
    Incorrect
  34. Question 34 of 55
    34. Question

    A _____  is the source of electric power for the required capacity and quality for an emergency power supply system (EPSS).

    Correct
    Incorrect
  35. Question 35 of 55
    35. Question

    The purpose of the _____ is to regulate the output voltage of the alternator to a specified value.

    Correct
    Incorrect
  36. Question 36 of 55
    36. Question

    The room in which the EPS equipment is located shall not be used for other purposes that are not directly related to the EPS.

    Correct
    Incorrect
  37. Question 37 of 55
    37. Question

    Parts, tools, and manuals for routine maintenance and repair shall not be permitted to be stored in the EPS room.

    Correct
    Incorrect
  38. Question 38 of 55
    38. Question

    In a lead-acid battery, the specific gravity of the electrolyte in each cell is to be checked _____ adding any distilled water to raise the level of electrolyte. 

    Correct
    Incorrect
  39. Question 39 of 55
    39. Question

    Battery charger leads are ______ be connected directly to the positive and negative battery posts. 

    Correct
    Incorrect
  40. Question 40 of 55
    40. Question

    In diesel engines, mixing oil viscosity is acceptable due to the durability of the engine.

    Correct
    Incorrect
  41. Question 41 of 55
    41. Question

    NFPA 110 states storage batteries, including electrolyte levels or battery voltage, used in connection with systems shall be inspected _____.

    Correct
    Incorrect
  42. Question 42 of 55
    42. Question

    NFPA 110 recommends a battery load test should be performed _____.

    Correct
    Incorrect
  43. Question 43 of 55
    43. Question

    A lead-acid battery consisting of sealed cells furnished with a valve that opens to vent the battery whenever the internal pressure of the battery exceeds the ambient pressure by a set amount.

    Correct
    Incorrect
  44. Question 44 of 55
    44. Question

    A lead-acid battery consisting of cells that have electrodes immersed in liquid electrolyte.

    Correct
    Incorrect
  45. Question 45 of 55
    45. Question

    Battery conductance testing shall be permitted in lieu of the testing of specific gravity.

    Correct
    Incorrect
  46. Question 46 of 55
    46. Question

    Each prime mover shall be provided with storage battery units and a storage rack for each battery or battery unit.

    Correct
    Incorrect
  47. Question 47 of 55
    47. Question

    Each prime mover shall be provided with either storage battery units or storage rack for each battery or battery unit.

    Correct
    Incorrect
  48. Question 48 of 55
    48. Question

    Battery conductance testing shall not be permitted in lieu of the testing of specific gravity.

    Correct
    Incorrect
  49. Question 49 of 55
    49. Question

    Transfer switches of the _____ branch are set to operate either automatically (but delayed) or automatically.

    Correct
    Incorrect
  50. Question 50 of 55
    50. Question

    Self-acting equipment for transferring the connected load from one power source to another power source.

    Correct
    Incorrect
  51. Question 51 of 55
    51. Question

    A manually operated device used in conjunction with an automatic transfer switch to provide a means of directly connecting load conductors to a power source and disconnecting the automatic transfer switch.

    Correct
    Incorrect
  52. Question 52 of 55
    52. Question

    The purpose of _____ is to tie two or more EPSs together electrically for the purpose of producing additional current for circuits.

    Correct
    Incorrect
  53. Question 53 of 55
    53. Question

    The _____ is self-acting equipment for transferring the connected load from one power source to another power source.

    Correct
    Incorrect
  54. Question 54 of 55
    54. Question

    The purpose of _____ is to provide automatic disconnection of each transfer switch in the event of excessive current drain by the load downstream from the transfer switch.

    Correct
    Incorrect
  55. Question 55 of 55
    55. Question

    When performing weekly inspections, ensure all transfer switches are locked and that the lights showing _____ power is available are illuminated. 