• Skip to primary navigation
  • Skip to main content
Motor and Generator Institute

Motor and Generator Institute

Emergency and Standby Power Education

  • My Training
  • Support
  • Log In
  • Main Site

Evaluation

Evaluation

Time limit: 0

Quiz Summary

0 of 18 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 18 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Evaluation 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 18
    1. Question

    Testing the EPS can be initiated by simulating a power outage using the test switch(es) on the ATSs or by opening a normal breaker.

    Correct
    Incorrect
  2. Question 2 of 18
    2. Question

    Load tests of generator sets [EPS’s] shall include complete cold starts.

    Correct
    Incorrect
  3. Question 3 of 18
    3. Question

    You are not allowed to start the EPS from the control panel of the EPS, let the EPS warm up, and then transfer the loads.

    Correct
    Incorrect
  4. Question 4 of 18
    4. Question

    According to NFPA 110, the date and time of day for required testing shall be decided by the ______.

    Correct
    Incorrect
  5. Question 5 of 18
    5. Question

    The date and time of day for required testing shall be decided by the owner.

    Correct
    Incorrect
  6. Question 6 of 18
    6. Question

    The date and time of required testing shall be determined by the service technician.

    Correct
    Incorrect
  7. Question 7 of 18
    7. Question

    Exercising the EPS for __ minutes at operating temperature or minimum exhaust temperature necessitates, under most circumstances, running the machine for ______ minutes including warm up and cool down.

    Correct
    Incorrect
  8. Question 8 of 18
    8. Question

    Diesel generator sets in service shall be exercised at least once monthly, for a minimum of __ minutes, under operating temperature conditions and at not less than __ percent of the EPS standby nameplate kW rating.

    Correct
    Incorrect
  9. Question 9 of 18
    9. Question

    Main and feeder circuit breakers shall be inspected _____ and a program for periodically exercising the components shall be established according to manufacturer’s recommendation.

    Correct
    Incorrect
  10. Question 10 of 18
    10. Question

    When testing Main and feeder circuit breakers you should not simulate overload trip conditions due to possibly damaging the breaker.

    Correct
    Incorrect
  11. Question 11 of 18
    11. Question

    The generator needs to run, with or without load, to be inspected.

    Correct
    Incorrect
  12. Question 12 of 18
    12. Question

    NFPA 110, _____ If the generator set is used for standby power or for peak load shaving, such use shall be recorded and shall be permitted to be substituted for scheduled operations and testing of the generator set, providing the same record as required by 8.3.4.

    Correct
    Incorrect
  13. Question 13 of 18
    13. Question

    According to NFPA 110, If the generator set is used for standby power or for peak load shaving, such use shall be recorded _____ be permitted to be substituted for scheduled operations and testing of the generator set.

    Correct
    Incorrect
  14. Question 14 of 18
    14. Question

    If the generator is used for standby power or for peak load shaving, such use shall be recorded and shall be permitted in lieu of scheduled operations and testing of the generator set.

    Correct
    Incorrect
  15. Question 15 of 18
    15. Question

    NFPA 110 states, starting time delays shall be set for a __ second minimum for diesel powered units and ___ second minimum for gas turbine units.

    Correct
    Incorrect
  16. Question 16 of 18
    16. Question

    Time delays for transfer to emergency power, after losing utility, should be set for 1-second.

    Correct
    Incorrect
  17. Question 17 of 18
    17. Question

    Time delays for restoration to normal power from emergency should be set for 1-minute.

    Correct
    Incorrect
  18. Question 18 of 18
    18. Question

    Time delays for restoration to normal power should be set for 5 minutes minimum.

    Correct
    Incorrect

Copyright © 2025 · Motor and Generator Institute